friendsoftheriverteign.orgLog in
Teign Village STW, Teign Valley

Spill evidence · Friends of the River Teign

Teign Village STW, Teign Valley

Storm overflow at the works · SBB01215 · feeds TEIGN VILLAGE_STW_TEIGN VALLEY
Dry spill

Evidence strength

Medium confidence
  • Dry across a 4-day antecedent window
  • Short discharge (<1 h) — weaker signal
  • Monitor only 75% operational that year — data may be incomplete

The discharge

Spill day
Friday, 24 November 2023
Started
24 Nov 2023, 11:34
Ended
24 Nov 2023, 12:08
Duration
34 minutes 2 seconds
Receiving water
Teign (Lower)
Parish
Hennock

Rainfall evidence

Daily rainfall at the matched gauge (Bovey Tracey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
24/11/2023 (spill day)0 mmdry
23/11/20230 mmdry
22/11/20230 mmdry
21/11/20230 mmdry
20/11/20230.2 mmdry

River flow that day: 7.64 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
EA annual return (2023)
131 counted spills · 415 h total
Monitor uptime (2023)
75% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01215). Rainfall: EA Hydrology gauge de3285a5-0abf-4c5b-8ee2-63187f9124ae. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — Teign Village STW, Teign Valley — River Teign Data