A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

39
Measures in this catchment
WINEP, current record
39
Still active
not yet past their date
0
Assumed complete
completion date has passed
6
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SW104944 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
BRIDFORD STW
Due 2026-27Teign (Lower)
08SW104943 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
BRIDFORD STW
Due 2026-27Teign (Lower)
08SW104914 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Chagford STW
Due 2026-27Teign (Upper)
08SW104913 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Chagford STW
Due 2026-27Teign (Upper)
08SW104901 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Christow STW
Due 2026-27Teign (Lower)
08SW104902 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Christow STW
Due 2026-27Teign (Lower)
08SW104899 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Chudleigh Knighton STW
Due 2026-272 overflows
08SW104900 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Chudleigh Knighton STW
Due 2026-272 overflows
08SW104891 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Chudleigh STW
Due 2026-272 overflows
08SW104898 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Chudleigh STW
Due 2026-272 overflows
08SW104883 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Compton & Marldon STW
Due 2026-27Aller Brook
08SW104884 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Compton & Marldon STW
Due 2026-27Aller Brook
08SW104859 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Dunsford STW
Due 2026-27Reedy Brook
08SW104858 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Dunsford STW
Due 2026-27Reedy Brook
08SW104855 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
East Ogwell STW
Due 2026-27Lemon
08SW104854 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
East Ogwell STW
Due 2026-27Lemon
08SW104795 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
HEATHFIELD STW
Due 2026-27Lower Bovey
08SW104796 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
HEATHFIELD STW
Due 2026-27Lower Bovey
08SW104744 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
LUSTLEIGH STW
Due 2026-27Wray Brook
08SW104743 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
LUSTLEIGH STW
Due 2026-27Wray Brook
08SW104714 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Moretonhampstead STW
Due 2026-272 overflows
08SW104715 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Moretonhampstead STW
Due 2026-272 overflows
08SW104575 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Teign Village STW
Due 2026-27Teign (Lower)
08SW104576 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Teign Village STW
Due 2026-27Teign (Lower)
08SW104999 · nEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
A382 BYPASS VERGE_CSO_BOVEY TRACEY
Due 2027-28Lower Bovey
08SW104999 · pEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
AYLIFFE'S FIELD_CSO_BOVEY TRACEY
Due 2027-28Lower Bovey
08SW104999 · yEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
BOVEY BRIDGE_CSO_BOVEY TRACEY
Due 2027-28Lower Bovey
08SW104999 · hmEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
CHUDLEIGH STW_SSO_NEWTON ABBOT
Due 2027-28Teign (Lower)
08SW104999 · hnEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
COMPTON CASTLE_CSO_COMPTON
Due 2027-28Aller Brook
08SW104999 · avEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
DUNSFORD STW_SO_TEIGN VALLEY
Due 2027-28Reedy Brook
08SW104999 · hrEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
EAST OGWELL STW_SSO_EAST OGWELL
Due 2027-28Lemon
08SW104999 · ggEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
HEATHFIELD STW_SSO_NEWTON ABBOT
Due 2027-28Lower Bovey
08SW104999 · doEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
RIVERSIDE_CSO_BOVEY TRACEY
Due 2027-28Lower Bovey
08SW100093 · aU_IMP4Improvement
Reduction of spills to meet EnvAct_IMP drivers
COMPTON CASTLE_CSO_COMPTON
Due 2027-28Aller Brook
08SW104002 · aWFD_IMP_WRHMWBImprovement
AMP7 investigation preferred option to be delivered.
Beadon Brook
Due 2029-30Beadon Brook
08SW100092 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
CHUDLEIGH STW_SSO_NEWTON ABBOT
Due 2029-30Teign (Lower)
08SW101471 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
DUNSFORD STW_SO_TEIGN VALLEY
Due 2029-30Reedy Brook
08SW101507 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
HEATHFIELD STW_SSO_NEWTON ABBOT
Due 2029-30Lower Bovey
08SW102113 · gU_IMP1Improvement
Improve discharge from agglomeration that has crossed 250 and has envirronmental imapct
BRIDFORD_STW_TEIGN VALLEY
Due 2030-31Teign (Lower)

39 of 39 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.