friendsoftheriverteign.orgLog in
Compton Castle

Spill evidence · Friends of the River Teign

Compton Castle

Combined sewer overflow · SBB00301 · feeds COMPTON AND MARLDON STW
Dry spill

Evidence strength

Medium confidence
  • Sustained discharge (≥1 h)
  • Dry on the EA 1-day window
  • Rain gauge close (≤5 km)
  • Monitor 97% operational that year

The discharge

Spill day
Monday, 19 February 2024
Started
19 Feb 2024, 21:48
Ended
19 Feb 2024, 22:54
Duration
1 hour 5 minutes
Receiving water
Aller Brook
Parish
Marldon

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
19/02/2024 (spill day)0.2 mmdry
18/02/20240 mmdry
17/02/202421.7 mmrain
16/02/20240.7 mmrain
15/02/202423 mmrain

River flow that day: 11.82 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
144 counted spills · 2069 h total
Monitor uptime (2024)
97% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00301). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.