friendsoftheriverteign.orgLog in
Compton Castle

Spill evidence · Friends of the River Teign

Compton Castle

Combined sewer overflow · SBB00301 · feeds COMPTON AND MARLDON STW
Wet weather

The discharge

Spill day
Saturday, 21 February 2026
Started
21 Feb 2026, 06:32
Ended
21 Feb 2026, 14:04
Duration
7 hours 31 minutes
Receiving water
Aller Brook
Parish
Marldon

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/02/2026 (spill day)5.8 mmrain
20/02/20262.3 mmrain
19/02/20260.2 mmdry
18/02/202626.7 mmrain
17/02/202620.3 mmrain

River flow that day: 14.307 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00301). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.