friendsoftheriverteign.orgLog in
Main St/town Orchard, Abbotskerswell

Spill evidence · Friends of the River Teign

Main St/town Orchard, Abbotskerswell

Combined sewer overflow · SBB01233 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Wet weather

The discharge

Spill day
Tuesday, 10 February 2026
Started
10 Feb 2026, 13:14
Ended
10 Feb 2026, 13:30
Duration
16 minutes
Receiving water
Aller Brook
Parish
Abbotskerswell

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/02/2026 (spill day)6.4 mmrain
09/02/202614.3 mmrain
08/02/20263.9 mmrain
07/02/20265 mmrain
06/02/202613.8 mmrain

River flow that day: 23.413 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01233). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — Main St/town Orchard, Abbotskerswell — River Teign Data