← Stewards Cottages, Moretonhampstead
Spill evidence · Friends of the River Teign
Stewards Cottages, Moretonhampstead
Combined sewer overflow · SBB01168 · feeds MORETONHAMPSTEAD_STW_MORETONHAMPSTEAD
Wet weather
The discharge
- Spill day
- Sunday, 15 February 2026
- Started
- 15 Feb 2026, 08:11
- Ended
- 15 Feb 2026, 08:45
- Duration
- 34 minutes 40 seconds
- Receiving water
- Wray Brook
- Parish
- Moretonhampstead
Rainfall evidence
Daily rainfall at the matched gauge (Mardon Down) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 15/02/2026 (spill day) | 6.9 mm | rain |
| 14/02/2026 | 3.4 mm | rain |
| 13/02/2026 | 1.9 mm | rain |
| 12/02/2026 | 2.8 mm | rain |
| 11/02/2026 | 5.6 mm | rain |
River flow that day: 17.088 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 3.0 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01168). Rainfall: EA Hydrology gauge 323b21d8-c9a4-4681-bc5c-62d7337993ac. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.