friendsoftheriverteign.orgLog in
Buckland Road, Newton Abbot

Spill evidence · Friends of the River Teign

Buckland Road, Newton Abbot

Combined sewer overflow · SBB01417 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Wet weather

The discharge

Spill day
Tuesday, 8 September 2026
Started
8 Sept 2026, 04:56
Ended
ongoing
Duration
Receiving water
Aller Brook (Teign) - Lower
Parish
Newton Abbot

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/09/2026 (spill day)1.56 mmrain
07/09/202617.15 mmrain
06/09/20260.05 mmdry
05/09/20260.07 mmdry
04/09/20260.15 mmdry

River flow that day: 0.815 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01417). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.