friendsoftheriverteign.orgLog in
Buckland Road, Newton Abbot

Spill evidence · Friends of the River Teign

Buckland Road, Newton Abbot

Combined sewer overflow · SBB01417 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Dry spill

Evidence strength

Medium confidence
  • Dry across a 4-day antecedent window
  • Monitor 99% operational that year
  • Short discharge (<1 h) — weaker signal

The discharge

Spill day
Sunday, 13 April 2025
Started
13 Apr 2025, 17:44
Ended
13 Apr 2025, 18:42
Duration
58 minutes
Receiving water
Aller Brook (Teign) - Lower
Parish
Newton Abbot

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
13/04/2025 (spill day)0.1 mmdry
12/04/20250.1 mmdry
11/04/20250 mmdry
10/04/20250 mmdry
09/04/20250 mmdry

River flow that day: 1.575 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
65 counted spills · 35 h total
Monitor uptime (2025)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01417). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.