friendsoftheriverteign.orgLog in
155 Bitton Park Road, Teignmouth

Spill evidence · Friends of the River Teign

155 Bitton Park Road, Teignmouth

Combined sewer overflow · SBB00115 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Wet weather

The discharge

Spill day
Friday, 21 August 2020
Started
21 Aug 2020, 07:32
Ended
21 Aug 2020, 08:26
Duration
54 minutes 1 second
Receiving water
Ugbrooke Stream
Parish
Teignmouth

Rainfall evidence

Daily rainfall at the matched gauge (Ashcombe) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/08/2020 (spill day)2.6 mmrain
20/08/20200.2 mmdry
19/08/20209.1 mmrain
18/08/202036.9 mmrain
17/08/202016.9 mmrain

River flow that day: 2.744 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00115). Rainfall: EA Hydrology gauge 4e00b4e3-af60-47cf-afe7-b36ac774ca82. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — 155 Bitton Park Road, Teignmouth — River Teign Data