friendsoftheriverteign.orgLog in
155 Bitton Park Road, Teignmouth

Spill evidence · Friends of the River Teign

155 Bitton Park Road, Teignmouth

Combined sewer overflow · SBB00115 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Dry spill

Evidence strength

Low confidence
  • Dry on the EA 1-day window
  • Short discharge (<1 h) — weaker signal

The discharge

Spill day
Saturday, 12 September 2026
Started
12 Sept 2026, 04:15
Ended
12 Sept 2026, 04:41
Duration
26 minutes 31 seconds
Receiving water
Ugbrooke Stream
Parish
Teignmouth

Rainfall evidence

Daily rainfall at the matched gauge (Ashcombe) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
12/09/2026 (spill day)0 mmdry
11/09/20260.05 mmdry
10/09/20261.9 mmrain
09/09/20260 mmdry
08/09/20262.67 mmrain

River flow that day: 0.557 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00115). Rainfall: EA Hydrology gauge 4e00b4e3-af60-47cf-afe7-b36ac774ca82. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.