← 155 Bitton Park Road, Teignmouth
Spill evidence · Friends of the River Teign
155 Bitton Park Road, Teignmouth
Combined sewer overflow · SBB00115 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Dry spill
Evidence strength
Medium confidence- ✓ Dry across a 4-day antecedent window
- ⚠ Short discharge (<1 h) — weaker signal
The discharge
- Spill day
- Monday, 21 September 2026
- Started
- 21 Sept 2026, 15:15
- Ended
- 21 Sept 2026, 15:30
- Duration
- 15 minutes
- Receiving water
- Ugbrooke Stream
- Parish
- Teignmouth
Rainfall evidence
Daily rainfall at the matched gauge (Ashcombe) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
| Date | Rainfall | |
|---|---|---|
| 21/09/2026 (spill day) | 0 mm | dry |
| 20/09/2026 | 0 mm | dry |
| 19/09/2026 | 0.07 mm | dry |
| 18/09/2026 | 0 mm | dry |
| 17/09/2026 | 0 mm | dry |
River flow that day: 0.583 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Teign Estuary
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00115). Rainfall: EA Hydrology gauge 4e00b4e3-af60-47cf-afe7-b36ac774ca82. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.