friendsoftheriverteign.orgLog in
Ayliffe's Field, Bovey Tracey

Spill evidence · Friends of the River Teign

Ayliffe's Field, Bovey Tracey

Combined sewer overflow · SBB00061 · feeds HEATHFIELD STW
Dry spill

Evidence strength

Medium confidence
  • Long discharge (≥6 h)
  • Dry on the EA 1-day window
  • Rain gauge close (≤5 km)

The discharge

Spill day
Friday, 10 July 2020
Started
10 Jul 2020, 09:10
Ended
10 Jul 2020, 16:54
Duration
7 hours 44 minutes
Receiving water
Lower Bovey
Parish
Bovey Tracey

Rainfall evidence

Daily rainfall at the matched gauge (Bovey Tracey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/07/2020 (spill day)0 mmdry
09/07/20200.2 mmdry
08/07/20200.6 mmrain
07/07/20200 mmdry
06/07/20200 mmdry

River flow that day: 1.071 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00061). Rainfall: EA Hydrology gauge de3285a5-0abf-4c5b-8ee2-63187f9124ae. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — Ayliffe's Field, Bovey Tracey — River Teign Data