friendsoftheriverteign.orgLog in
Chagford Main STW

Spill evidence · Friends of the River Teign

Chagford Main STW

Storm overflow at the works · SBB00227 · feeds CHAGFORD MAIN_STW_CHAGFORD
Wet weather

The discharge

Spill day
Friday, 9 January 2026
Started
9 Jan 2026, 06:09
Ended
9 Jan 2026, 06:47
Duration
38 minutes
Receiving water
Teign (Upper)
Parish
Chagford

Rainfall evidence

Daily rainfall at the matched gauge (Mardon Down) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/01/2026 (spill day)3.5 mmrain
08/01/202628.8 mmrain
07/01/20261.2 mmrain
06/01/20261.9 mmrain
05/01/20260 mmdry

River flow that day: 15.709 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00227). Rainfall: EA Hydrology gauge 323b21d8-c9a4-4681-bc5c-62d7337993ac. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.