← Bunkers Bridge, Chudleigh Knighton
Spill evidence · Friends of the River Teign
Bunkers Bridge, Chudleigh Knighton
Combined sewer overflow · SBB00190 · feeds CHUDLEIGH KNIGHTON_STW_CHUDLEIGH KNIGHTO
Wet weather
The discharge
- Spill day
- Monday, 1 June 2026
- Started
- 1 Jun 2026, 21:46
- Ended
- 1 Jun 2026, 22:04
- Duration
- 18 minutes
- Receiving water
- Teign (Lower)
- Parish
- Hennock
Rainfall evidence
Daily rainfall at the matched gauge (Bovey Tracey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 01/06/2026 (spill day) | 13.4 mm | rain |
| 31/05/2026 | 0 mm | dry |
| 30/05/2026 | 0 mm | dry |
| 29/05/2026 | 0 mm | dry |
| 28/05/2026 | 0 mm | dry |
River flow that day: 1.042 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.1 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Teign Estuary
- Ahead of the works
- No — the works was also overflowing that day.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00190). Rainfall: EA Hydrology gauge de3285a5-0abf-4c5b-8ee2-63187f9124ae. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.