friendsoftheriverteign.orgLog in
Bunkers Bridge, Chudleigh Knighton

Spill evidence · Friends of the River Teign

Bunkers Bridge, Chudleigh Knighton

Combined sewer overflow · SBB00190 · feeds CHUDLEIGH KNIGHTON_STW_CHUDLEIGH KNIGHTO
Wet weather

The discharge

Spill day
Monday, 14 October 2024
Started
14 Oct 2024, 00:24
Ended
14 Oct 2024, 01:02
Duration
38 minutes
Receiving water
Teign (Lower)
Parish
Hennock

Rainfall evidence

Daily rainfall at the matched gauge (Bovey Tracey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
14/10/2024 (spill day)2.6 mmrain
13/10/202424 mmrain
12/10/20240 mmdry
11/10/20240.5 mmrain
10/10/20240 mmdry

River flow that day: 9.178 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
40 counted spills · 75 h total
Monitor uptime (2024)
98% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00190). Rainfall: EA Hydrology gauge de3285a5-0abf-4c5b-8ee2-63187f9124ae. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.