friendsoftheriverteign.orgLog in
Bunkers Bridge, Chudleigh Knighton

Spill evidence · Friends of the River Teign

Bunkers Bridge, Chudleigh Knighton

Combined sewer overflow · SBB00190 · feeds CHUDLEIGH KNIGHTON_STW_CHUDLEIGH KNIGHTO
Wet weather

The discharge

Spill day
Saturday, 25 May 2024
Started
25 May 2024, 05:20
Ended
25 May 2024, 21:06
Duration
15 hours 46 minutes
Receiving water
Teign (Lower)
Parish
Hennock

Rainfall evidence

Daily rainfall at the matched gauge (Bovey Tracey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/05/2024 (spill day)9.7 mmrain
24/05/20240 mmdry
23/05/20240 mmdry
22/05/20248.6 mmrain
21/05/20247.2 mmrain

River flow that day: 3.766 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
40 counted spills · 75 h total
Monitor uptime (2024)
98% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00190). Rainfall: EA Hydrology gauge de3285a5-0abf-4c5b-8ee2-63187f9124ae. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.