friendsoftheriverteign.orgLog in
Bunkers Bridge, Chudleigh Knighton

Spill evidence · Friends of the River Teign

Bunkers Bridge, Chudleigh Knighton

Combined sewer overflow · SBB00190 · feeds CHUDLEIGH KNIGHTON_STW_CHUDLEIGH KNIGHTO
Wet weather

The discharge

Spill day
Thursday, 21 September 2023
Started
21 Sept 2023, 12:20
Ended
21 Sept 2023, 13:00
Duration
40 minutes
Receiving water
Teign (Lower)
Parish
Hennock

Rainfall evidence

Daily rainfall at the matched gauge (Bovey Tracey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/09/2023 (spill day)10.3 mmrain
20/09/202316.4 mmrain
19/09/202313.1 mmrain
18/09/20231 mmrain
17/09/202317.3 mmrain

River flow that day: 4.558 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2023)
40 counted spills · 60 h total
Monitor uptime (2023)
96% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00190). Rainfall: EA Hydrology gauge de3285a5-0abf-4c5b-8ee2-63187f9124ae. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.