friendsoftheriverteign.orgLog in
← All spills

Dunsford STW, Teign Valley

SBB00388
Overflow on the network feeding Dunsford STW · Storm overflow
Showing history for 2026 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
17 Mar, 00:28
Counted spills, 2026
76
3 discharge events
Hours spilled, 2026
1,813
Is the feed working?
Working
Last checked 31 min ago · we poll SWW hourly
48h agonow
47/48 hourly readings received
Dry spills, 2026
0
None in 2026 · 256 since 2020
How a dry spill is decided →
Spilled before its STW, 2026
0
0 in 2026 · 0 since 2020
What this means →
Why this one spills

This looks like a fault, not a storm.

This overflow has discharged in dry weather 256 times since 2020 — spills with no rainfall to excuse them. Its treatment works is not itself over capacity, so a catchment-wide explanation does not hold. Applied to this record, the two-stage lawfulness test is hard to pass: a recurring dry-weather discharge is not an exceptional circumstance, and where the remedy is routine maintenance the disproportionate-cost exception is hard to run.

How this verdict is reached →

Can its works cope?

Full capacity view →

This overflow drains to Dunsford STW, serving about 670 people.

of permitted flow
Not assessed

We cannot check the works — its permitted flow or population served is missing from the public record.

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 10/year)

Is anyone acting on this?

Flagged problems
High spill frequency1,304 discharge events since 2020Very long spills2,471 hours in the last full yearDry spilling256 dry spills since 2020
Measures on record
  • PR24 U_MON4 from U_INV2 investigation (U_MON4c)
    Monitoringdue 2026
  • MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
    Monitoringdue 2026
  • Investigation to meet EnvAct INV4 Driver
    Investigationdue 2027
  • Reduction of spills to meet EnvAct_IMP drivers
    Improvementdue 2030
Verdict
Improvement under way

A physical improvement is committed against this overflow.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Dunsford STW, Teign Valley's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

256 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2026: 76 spills · 3 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Spills by month — 2026 to date

Dry Wet weather
1Jan
Feb
2Mar

Every spill in 2026, most recent first

Each event checked against the nearest rain gauge and against the treatment works’ own overflow. Open any row for its evidence dossier.

16 Mar, 11:16
13h 12m
1.4 mm
Wet weather
Also spilling
16 Mar, 11:16
13h 12m
1.4 mm
Wet weather
Also spilling
1 Jan, 00:00
1787h 2m
1.2 mm
Wet weather
Also spilling
1 brief spill under 15 minutes in 2026

Excluded from the counts, classification and flags above — too short to weigh against rainfall, and often an operational blip rather than a genuine discharge. Listed here for completeness. How we know.

16 Mar, 11:04 · 12m