friendsoftheriverteign.orgLog in
Market Walk, Newton Abbot

Spill evidence · Friends of the River Teign

Market Walk, Newton Abbot

Combined sewer overflow · SBB00749 · feeds NEWTON ABBOT / TEIGNMOUTH STW
No rain data

The discharge

Spill day
Thursday, 26 March 2020
Started
26 Mar 2020, 08:30
Ended
27 Mar 2020, 11:07
Duration
1 day 2 hours
Receiving water
Lemon
Parish
Newton Abbot

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
26/03/2020 (spill day)no data
25/03/2020no data
24/03/2020no data
23/03/2020no data
22/03/2020no data

River flow that day: 4.672 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00749). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — Market Walk, Newton Abbot — River Teign Data