friendsoftheriverteign.orgLog in
Lemon Rd, Newton Abbot

Spill evidence · Friends of the River Teign

Lemon Rd, Newton Abbot

Combined sewer overflow · SBB00837 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Dry spill

Evidence strength

Low confidence
  • Dry across a 3-day window
  • Short discharge (<1 h) — weaker signal

The discharge

Spill day
Tuesday, 12 May 2026
Started
12 May 2026, 10:57
Ended
12 May 2026, 11:14
Duration
16 minutes 47 seconds
Receiving water
Lemon
Parish
Newton Abbot

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Wet weather
DateRainfall
12/05/2026 (spill day)0.2 mmdry
11/05/20260 mmdry
10/05/20260 mmdry
09/05/20260.2 mmdry
08/05/20260.6 mmrain

River flow that day: 1.172 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00837). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — Lemon Rd, Newton Abbot — River Teign Data