Love Ln, Marldon

Spill evidence · Friends of the River Teign

Love Ln, Marldon

Combined sewer overflow · SBB00707 · feeds COMPTON AND MARLDON STW
Wet weather

The discharge

Spill day
Wednesday, 18 February 2026
Started
18 Feb 2026, 17:54
Ended
18 Feb 2026, 18:29
Duration
34 minutes 10 seconds
Receiving water
Aller Brook
Parish
Marldon

Rainfall evidence

Daily rainfall at the matched gauge (Torbay Compton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/02/2026 (spill day)26.7 mmrain
17/02/202620.3 mmrain
16/02/20262.7 mmrain
15/02/202610.4 mmrain
14/02/20266.3 mmrain

River flow that day: 31.861 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00707). Rainfall: EA Hydrology gauge e7e2f7d4-f497-4adc-b077-c20bc2dcedfa. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.