friendsoftheriverteign.orgLog in
Thompsons Transport, Moretonhampstead

Spill evidence · Friends of the River Teign

Thompsons Transport, Moretonhampstead

Combined sewer overflow · SBB01239 · feeds MORETONHAMPSTEAD_STW_MORETONHAMPSTEAD
Wet weather

The discharge

Spill day
Monday, 26 January 2026
Started
26 Jan 2026, 19:33
Ended
26 Jan 2026, 19:52
Duration
19 minutes 30 seconds
Receiving water
Wray Brook
Parish
Moretonhampstead

Rainfall evidence

Daily rainfall at the matched gauge (Mardon Down) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
26/01/2026 (spill day)76.5 mmrain
25/01/20264.3 mmrain
24/01/202618.3 mmrain
23/01/202630.1 mmrain
22/01/202623.8 mmrain

River flow that day: 72.653 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01239). Rainfall: EA Hydrology gauge 323b21d8-c9a4-4681-bc5c-62d7337993ac. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.