← Milford Park pumping station, Teignmouth
Spill evidence · Friends of the River Teign
Milford Park pumping station, Teignmouth
Pumping station overflow · SBB00774 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Wet weather
The discharge
- Spill day
- Sunday, 24 November 2024
- Started
- 24 Nov 2024, 14:56
- Ended
- 24 Nov 2024, 17:26
- Duration
- 2 hours 30 minutes
- Receiving water
- Ugbrooke Stream
- Parish
- Teignmouth
Rainfall evidence
Daily rainfall at the matched gauge (Ashcombe) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 24/11/2024 (spill day) | 29.4 mm | rain |
| 23/11/2024 | 42.3 mm | rain |
| 22/11/2024 | 12.9 mm | rain |
| 21/11/2024 | 4.1 mm | rain |
| 20/11/2024 | 13.3 mm | rain |
River flow that day: 97.768 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Shaldon
- Shellfish water
- Teign Estuary
- Ahead of the works
- Unknown (no works overflow data)
- EA annual return (2024)
- 2 counted spills · 3 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00774). Rainfall: EA Hydrology gauge 4e00b4e3-af60-47cf-afe7-b36ac774ca82. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.