friendsoftheriverteign.orgLog in
Ringmore Rd, Shaldon

Spill evidence · Friends of the River Teign

Ringmore Rd, Shaldon

Combined sewer overflow · SBB01027 · feeds NEWTON ABBOT / TEIGNMOUTH STW
Wet weather

The discharge

Spill day
Sunday, 18 February 2024
Started
18 Feb 2024, 03:48
Ended
18 Feb 2024, 04:49
Duration
1 hour
Receiving water
Ugbrooke Stream
Parish
Shaldon

Rainfall evidence

Daily rainfall at the matched gauge (Ashcombe) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/02/2024 (spill day)0 mmdry
17/02/202416.6 mmrain
16/02/20240.1 mmdry
15/02/202416.6 mmrain
14/02/20243.2 mmrain

River flow that day: 20.518 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Teign Estuary
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
21 counted spills · 25 h total
Monitor uptime (2024)
97% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01027). Rainfall: EA Hydrology gauge 4e00b4e3-af60-47cf-afe7-b36ac774ca82. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Teign Data.
Spill evidence — Ringmore Rd, Shaldon — River Teign Data