A382 Bypass Verge, Bovey Tracey
The monitor is reporting and shows no discharge.
The problem here is local, not the works.
This overflow spilled 46 times on days its own treatment works stayed shut — so the works still had capacity. That points upstream, to this branch of the network, rather than to a works too small for its catchment.
How this verdict is reached →Its permit
What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.
- Pass-forward flow
- Not published
- Spill frequency limit
- None set
- Monitoring tier
- Not published
- Assessment trigger
- Not crossed (threshold 10/year)
Is anyone acting on this?
- Investigation to meet EnvAct INV4 DriverInvestigationdue 2027
An investigation or monitoring measure is active — a step towards a fix, not a fix in itself. It must lead to an improvement before anything changes.
What you can do about this one
Ask for the data
Under the Environmental Information Regulations, A382 Bypass Verge, Bovey Tracey's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.
Get it into the next programme
Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.
Put it in the drainage plan
South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.
The record since 2020
0 dry spills and 46 pre-STW spills since 2020. Pick a year to see its events below.
2026: 0 spills · 0 discharge events
Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →
Dry spills, every year
0 dry spills since 2020 · showing up to 12
No dry spills on record for this overflow since 2020.
Spilled before its works
46 events since 2020 · started while Heathfield STW stayed shut
No spills over 15 minutes in 2026
Nothing over 15 minutes in 2026 so far — its only activity was the brief spill under 15 minutes, listed below.
Excluded from the counts, classification and flags above — too short to weigh against rainfall, and often an operational blip rather than a genuine discharge. Listed here for completeness. How we know.