Chudleigh Knighton STW

SBB00253
Overflow on the network feeding Chudleigh Knighton STW · Storm sewage overflow
Shellfish water · Teign Estuary
Showing history for 2020 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
13 Mar, 04:08
Counted spills, 2020
27
17 discharge events
Hours spilled, 2020
244
Is the feed working?
Working
Last checked 29 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2020
0
None in 2020 · 0 since 2020
How a dry spill is decided →
Spilled before its STW, 2020
0
0 in 2020 · 0 since 2020
What this means →

Can its works cope?

Full capacity view →

This overflow drains to Chudleigh Knighton STW, serving about 1,810 people.

of permitted flow
Not assessed

The works has headroom — so spills here point to another problem, often on that branch of the network (a blockage, a failed pump or infiltration).

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems

Nothing flagged by the analysis.

Measures on record
  • Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
    Monitoringdue 2026
  • MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
    Monitoringdue 2026
Verdict
Under investigation

An investigation or monitoring measure is active — a step towards a fix, not a fix in itself. It must lead to an improvement before anything changes.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Chudleigh Knighton STW's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

0 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2020: 27 spills · 17 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Dry spills, every year

0 dry spills since 2020 · showing up to 12

No dry spills on record for this overflow since 2020.

Spilled before its works

0 events since 2020 · started while Chudleigh Knighton STW stayed shut

This overflow has never been recorded spilling ahead of its treatment works.

Spills by month, 2020

Dry Wet weather
3Jan
4Feb
Mar
Apr
May
1Jun
Jul
3Aug
Sep
2Oct
1Nov
3Dec