friendsoftheriverteign.orgLog in
← All spills

Clock Tower, Newton Abbot

SBB00278
Overflow on the network feeding Newton Abbot / Teignmouth STW · Combined sewer overflow
Shellfish water · Teign Estuary
Showing history for 2025 · records go back to 2020
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
29 Aug, 00:17
Counted spills, 2025
8
3 discharge events
Hours spilled, 2025
1
Is the feed working?
Working
Last checked 22 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2025
0
None in 2025 · 0 since 2020
How a dry spill is decided →
Spilled before its STW, 2025
3
3 in 2025 · 6 since 2020
What this means →
Why this one spills

The problem here is local, not the works.

This overflow spilled 6 times on days its own treatment works stayed shut — so the works still had capacity. That points upstream, to this branch of the network, rather than to a works too small for its catchment.

How this verdict is reached →

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 10/year)

Is anyone acting on this?

Flagged problems
Spills before its works6 times since 2020
Measures on record

Nothing on record.

Verdict
No action recorded

A flagged problem with no active measure against it. That is a gap in the public record.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Clock Tower, Newton Abbot's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

0 dry spills and 6 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2025: 8 spills · 3 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Dry spills, every year

0 dry spills since 2020 · showing up to 12

No dry spills on record for this overflow since 2020.

Spills by month — 2025 to date

Dry Wet weather
Jan
Feb
Mar
1Apr
May
1Jun
Jul
1Aug

Every spill in 2025, most recent first

Each event checked against the nearest rain gauge and against the treatment works’ own overflow. Open any row for its evidence dossier.

29 Aug, 00:02
15m
18.5 mm
Wet weather
Not spilling — flagged before STW
12 Jun, 09:14
17m
26.4 mm
Wet weather
Not spilling — flagged before STW
15 Apr, 22:19
19m
58.7 mm
Wet weather
Not spilling — flagged before STW
6 brief spills under 15 minutes in 2025

Excluded from the counts, classification and flags above — too short to weigh against rainfall, and often an operational blip rather than a genuine discharge. Listed here for completeness. How we know.

1 Dec, 16:26 · 7m9 Sept, 20:29 · 8m9 Sept, 16:26 · 11m31 Jul, 13:33 · 11m24 Jan, 05:35 · 5m23 Jan, 11:05 · 8m