friendsoftheriverteign.org ↗Log in
← All spills

Cheriton Bishop STW

SBB00241
Overflow on the network feeding Cheriton Bishop System · Storm sewage overflow
Showing history for 2022 · records go back to 2021
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
26 Oct, 13:53
Counted spills, 2022
63
16 discharge events
Hours spilled, 2022
1,173
Is the feed working?
Working
Last checked 13 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2022
0
None in 2022 · 5 since 2020
How a dry spill is decided →
Spilled before its STW, 2022
0
0 in 2022 · 0 since 2020
What this means →
Why this one spills

This overflow spills far more than most.

On the analysis this is one of the catchment's heavier or longer-running overflows. Its treatment works is not recorded as over capacity, so the volume is worth explaining. See the record below, and how the verdict is reached.

How this verdict is reached →

Can its works cope?

Full capacity view →

This overflow drains to Cheriton Bishop System.

—
of permitted flow
Not assessed

We cannot check the works — its permitted flow or population served is missing from the public record.

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Crossed — over 10 spills/year

Is anyone acting on this?

Flagged problems
High spill frequency404 discharge events since 2020Very long spills512 hours in the last full yearDry spilling5 dry spills since 2020
Measures on record

Nothing on record.

Verdict
No action recorded

A flagged problem with no active measure against it. That is a gap in the public record.

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Cheriton Bishop STW's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

Put this on the national record

This is the fastest way to act on what you have seen. Our petition asks the Government to publish a fix-by date and yearly progress for every storm overflow. At 100,000 signatures it must be considered for debate in Parliament.

19of 10,000 for a Government response
Sign the petition ↗

The record since 2020

5 dry spills and 0 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2022: 63 spills · 16 discharge events

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Spilled before its works

0 events since 2020 · started while Cheriton Bishop System stayed shut

This overflow has never been recorded spilling ahead of its treatment works.

Spills by month, 2022

Dry Wet weather
2Jan
Feb
3Mar
Apr
May
Jun
Jul
Aug
1Sep
3Oct
4Nov
3Dec