Broomhill pumping station, Chagford
The monitor is reporting and shows no discharge.
Its permit
What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.
- Pass-forward flow
- Not published
- Spill frequency limit
- None set
- Monitoring tier
- Not published
- Assessment trigger
- Not crossed (threshold 30/year)
What you can do about this one
Ask for the data
Under the Environmental Information Regulations, Broomhill pumping station, Chagford's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.
Get it into the next programme
Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.
Put it in the drainage plan
South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.
The record since 2020
0 dry spills and 1 pre-STW spills since 2020. Pick a year to see its events below.
2025: 0 spills · 0 discharge events
Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →
Dry spills, every year
0 dry spills since 2020 · showing up to 12
No dry spills on record for this overflow since 2020.
Spilled before its works
1 events since 2020 · started while Chagford Main STW stayed shut
No spills over 15 minutes in 2025
Nothing over 15 minutes was recorded at this overflow in 2025. Discharges shorter than 15 minutes are excluded everywhere on this site — a brief operational blip is not counted as a spill. How we know.