friendsoftheriverteign.orgLog in
← All spills

Lime St, Moretonhampstead

SBB00744
Overflow on the network feeding Moretonhampstead STW · Combined sewer overflow
Showing history for 2023 · records go back to 2023
Not spilling

The monitor is reporting and shows no discharge.

Last spill ended
27 Jan, 05:50
Counted spills, 2023
10
1 discharge events
Hours spilled, 2023
0
Is the feed working?
Working
Last checked 21 min ago · we poll SWW hourly
48h agonow
48/48 hourly readings received
Dry spills, 2023
0
None in 2023 · 0 since 2020
How a dry spill is decided →
Spilled before its STW, 2023
0
0 in 2023 · 3 since 2020
What this means →

Can its works cope?

Full capacity view →

This overflow drains to Moretonhampstead STW, serving about 1,729 people.

of permitted flow
Not assessed

The works has headroom — so spills here point to another problem, often on that branch of the network (a blockage, a failed pump or infiltration).

Its permit

What the environmental permit sets for this overflow — and where the public record is silent, which is itself the finding.

Pass-forward flow
Not published
Spill frequency limit
None set
Monitoring tier
Not published
Assessment trigger
Not crossed (threshold 10/year)

What you can do about this one

OPEN NOW

Ask for the data

Under the Environmental Information Regulations, Lime St, Moretonhampstead's telemetry, the works' flow-to-full-treatment setting, and any spill investigations are emissions information — they cannot be withheld on commercial-confidentiality grounds. A written request is the fastest lever.

BY 30 APR 2027

Get it into the next programme

Investigations that will shape the 2030–35 environment programme must complete by this date. Putting this overflow on the record now — to South West Water and the Environment Agency — is what gets it considered.

BY 1 NOV 2027

Put it in the drainage plan

South West Water's draft Drainage & Wastewater Management Plan goes to a twelve-week consultation. A named overflow with evidence behind it is far harder to leave out.

The record since 2020

0 dry spills and 3 pre-STW spills since 2020. Pick a year to see its events below.

Count by

2023: 10 spills · 1 discharge event

Counted spills — the EA's 12/24-hour block method, the basis of the 10-a-year cap. Published annual return where available, computed the same way for the current year. Two ways to count →

Dry spills, every year

0 dry spills since 2020 · showing up to 12

No dry spills on record for this overflow since 2020.

Spilled before its works

3 events since 2020 · started while Moretonhampstead STW stayed shut

27 Jan, 03:21
2h 29m
76.5
Stayed shut
26 Jan, 22:54
3h 58m
76.5
Stayed shut
19 Oct, 00:54
19m
19.6
Stayed shut

Spills by month, 2023

Dry Wet weather
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
1Sep

Every spill in 2023, most recent first

Each event checked against the nearest rain gauge and against the treatment works’ own overflow. Open any row for its evidence dossier.

17 Sept, 02:25
27m
34.4 mm
Wet weather
Also spilling
2 brief spills under 15 minutes in 2023

Excluded from the counts, classification and flags above — too short to weigh against rainfall, and often an operational blip rather than a genuine discharge. Listed here for completeness. How we know.

2 Nov, 02:18 · 7m26 Aug, 04:42 · 3m